532 Bloy Street | Hillside, NJ 07205
At BF Construction, our work speaks for itself. From reinforced concrete foundations to intricate masonry and full-scale commercial builds, every project is a testament to our craftsmanship, precision, and reliability. Explore our portfolio to see how we’ve delivered durable, code-compliant construction solutions for clients across New Jersey’s commercial, industrial, and healthcare sectors. Each project highlights our commitment to safety, timelines, and budget—building spaces that last and elevate the businesses they serve.
Call Us Today (973)344‑5141
Our commercial concrete services are tailored for high-volume, high-performance builds.
Transforming an aging retail shell into a vibrant fitness destination required both vision and precision. BF Construction was selected as the general contractor to lead this effort, overseeing the complete interior renovation for Fitness Factory’s new location in Flanders, NJ. The challenge was to repurpose an outdated commercial space and deliver a modern gym environment equipped with the amenities today’s members expect, while staying on schedule and in compliance with all building codes.
This project showcases BF Construction’s ability to adapt existing structures into specialized facilities. By coordinating every phase, from structural modifications to high-end finish work, we created a space that not only met Fitness Factory’s operational needs but also elevated the overall member experience. The result is a state-of-the-art fitness center designed for performance, wellness, and long-term durability.
BF Construction was contracted to manage a series of phased renovations for Universal Display’s existing facility in Ewing, NJ. This multi-stage approach allowed for ongoing improvements without disrupting day-to-day operations, ensuring that the building remained functional throughout the process. With a total project value exceeding $500,000, the work combined structural upgrades with exterior enhancements, delivering a modernized, code-compliant facility designed for long-term performance.
The renovations included excavation, new footings, reinforced concrete walls, slab installation, and the construction of a brick façade to enhance both durability and curb appeal. Each phase required detailed planning and coordination with engineers, project managers, and stakeholders to maintain schedules and safety standards. The result is a facility that blends structural strength, architectural improvements, and operational reliability, underscoring BF Construction’s expertise in complex commercial renovations.
Over the course of more than a year, BF Construction partnered with Merola Tile to deliver a series of significant infrastructure and facility improvements at their Farmingdale, NJ location. The scope of work involved complex site work, structural upgrades, and critical utility connections, all performed while keeping the facility operational. With a combined project value exceeding $1 million, the work required detailed planning and seamless coordination to ensure safety, compliance, and continuity of operations.
The projects included new water and sewer line connections to the street, complete with excavation, associated site work, and paving. Our team also managed the demolition and replacement of the loading dock slab, installation of new loading docks, and a series of smaller targeted upgrades across the facility. Each phase reinforced Merola Tile’s operational efficiency and long-term durability, showcasing BF Construction’s expertise in multi-phase commercial improvements and infrastructure-focused construction.
BF Construction was contracted to renovate an aging commercial building and convert it into a modern indoor sports complex. The project required significant structural modifications to adapt the old structure for its new purpose, while ensuring compliance with current building codes and accessibility standards. With a project value exceeding $350,000, our team managed the work to deliver a safe, functional, and visually appealing facility that could accommodate a wide range of indoor athletic activities.
The renovation involved creating large new window openings to bring natural light into the facility, replacing deteriorated CMU walls, and constructing new exterior stairs and ramps for improved access and circulation. Additional site and structural upgrades ensured that the building was not only code-compliant but also tailored to the demands of a high-traffic recreational facility. This project highlights BF Construction’s ability to repurpose older commercial properties into specialized, community-focused spaces, aligning design, safety, and usability in every detail.
Bethlehem, PA
BF Construction was engaged to perform a full replacement of a 10,000-square-foot concrete slab at Linde’s Bethlehem facility. This project required careful planning and execution to remove existing structural elements and install a new foundation system capable of supporting ongoing industrial operations. With a project value of approximately $280,000, our team focused on delivering a solution that balanced speed, durability, and safety within an active facility environment.
The scope of work included demolition of the existing slab, installation of a new foundation wall, and placement of a high-performance concrete slab designed for heavy-duty use. Additional support work involved mechanical footings and other structural elements to reinforce critical areas of the facility. This project underscores BF Construction’s expertise in large-scale concrete construction and our ability to deliver precise, code-compliant results that align with industrial performance requirements.
BF Construction was selected to complete a highly technical buildout for Brookside Flavors’ Branchburg facility, constructing three large CMU clean rooms designed to meet stringent operational standards. This project required careful planning, precise execution, and coordination between structural demolition, excavation, and concrete work. With a total project value of approximately $240,000, the work showcased our ability to deliver specialized construction solutionsthat support production, compliance, and long-term facility performance.
The clean rooms were constructed with 12-inch CMU walls rising more than 20 feet high, requiring reinforced foundations and precise masonry installation. To support this work, our crews managed slab demolition, excavation, new footing installation, and reinforced concrete slab placement, ensuring durability and stability for the high-specification environment. The project highlights BF Construction’s capacity to execute complex industrial and commercial builds, blending technical expertise with reliable project management.
Let’s Build Something Solid Call (973)344‑5141
Looking to start a new commercial or industrial project in New Jersey? Whether you need concrete, masonry, or full general contracting services, BF Construction is ready to deliver. Contact our team in Hillside, NJ for a quote or consultation today.